Case Study 8

Determining the location of damage to a pipe

Reduct_Steel_Pipe_Vector_Image

– HDPE
– Ø 200mm (8”) ID

Reduct DR4 / ABM90 Wheel-Unit-0820
Reduct_Ruler_Vector_Image

– Length: 191m (627’)
– Depth: 17.5m (57’)

Reduct As-build case study

An exisiting pipe near a new road development failed the roundness calibration test after the road was completed. The deformation proved so severe that the survey probe could not pass the damaged point. Therefore, two single-entry surveys (A and B) were conducted, starting at the nearest access points on each side of the damage. The two survey results were merged in AutoCAD to determine the exact strike location.

Reduct As-build depth profile

Subsequent to the measurement, the DR-4 probe  was  fitted
with  the  DRC-2 modular camera unit to obtain footage of the
extent of  the damage.

The measurement results clearly identified the cause of the damage and the results were used in the insurance claim.